| Port Tariff |
| 1. |
Charges against shipowner or ships' agent |
| |
1.1 |
Conservancy Due |
|
|
|
| |
|
Use of other facilities to ensure safety
in entering and leaving port area including cost for using
of line handling service to/from berth for vessels depend
on GRT at the original port of registration |
|
| |
|
|
|
Amount(Bath) |
| |
|
1.1.1 |
Vessel larger not more than 750 GRT (Minimum
charge 1,000.-Bath / Vessel/Day) |
1.- / GRT |
| |
|
1.1.2 |
Vessel larger from 750 - 2,250 GRT |
5.- / GRT |
| |
|
1.1.3 |
Vessel larger from over 2,251 GRT |
7.- / GRT |
| |
|
| |
1.2 |
Berth Hire |
10.00 Baht
/ 100 GRT / Hour |
| |
|
Use of berth for vessel charges are made
according to berthing place and calculating per hour as
follow |
|
| |
|
| |
1.3 |
Tug Service |
35,000 Baht / Movement /
Tug |
| |
|
Use of tug service, mooring and unmooring |
|
| |
|
| |
1.4 |
General Cargo Wharfage Charges |
| |
|
Use of berthing area for general cargo to
or from vessel include moving cargo to or from storage
area |
|
|
|
| |
|
1.4.1 |
Import Cargo |
Amount (Bath) |
| |
|
|
At berth to storage area. |
50.- / RT |
| |
|
|
At berth direct delivery on land or to barge. |
45.- / RT |
| |
|
|
Vehicle discharged by its own gear to storage area. |
50.- / RT |
| |
|
1.4.2 |
Export Cargo. |
Amount (Bath) |
| |
|
|
To vessel at berth. |
40.- / RT |
| |
|
|
Vehicle loaded by its own gear at berth. |
40.- / RT |
| |
|
1.4.3 |
Through or Transhipment Cargo. |
40.- / RT |
| |
|
|
In case of land at berthing area for moving or charging
to order hold in this vessel must lift on vessel in a
day. |
| |
|
1.4.4 |
Liquid Bulk Cargo |
70.- / RT |
| |
|
| |
1.5 |
Garbage Charge |
|
(By Quotation) |
| |
|
For garbage collecting service
charge depends on vessel order |
|
|
| |
|
| |
1.6 |
Water Supply Service |
| |
|
Charge is |
|
(By Quotation) |
| |
|
(Minimum charge is 50 tons) |
| |
|
| |
1.7 |
Passenger Fee Charge |
| |
|
Charge is |
|
60.-/Person/Tip |
| |
|
(Fee for individual passenger entering or leaving at berth area) |
| |
|
| |
1.8 |
Quay Cleaning Charge |
| |
|
Charge is |
|
500.-/Vessel/Day |
| |
|
(Charge for cleaning berth which are calculated per day commencing
from the hour of berthing) |
|
|
| |
|
| Remarks :: |
item 1.5,1.6,1.7 and 1.8 charges depend on customer's order |
|
| 2. |
Charge against Consignee or Consignor |
| |
2.1 |
Wharf Handling Charges |
| |
|
For Handling of general cargo at storage
area to distribute to consignee at the required place
through customs area by land or barge. |
| |
|
|
|
Amount (Bath) |
| |
|
2.1.1 |
Import Cargo |
45.- / RT |
| |
|
2.1.2 |
Export Cargo |
40.- / RT |
| |
|
2.1.3 |
In Case of general cargo move from yard to transit warehouse
plus intake and outtake charge |
60.- / RT |
| |
|
| |
2.2 |
Additional Wharf
Handling Charges |
|
| |
|
2.2.1 |
Import cargo moves into customs examination area, moves
back to storage area and moves again to customs examination
area, to distribute to consignee, additional charge is |
40.- / RT |
| |
|
2.2.2 |
Import cargo which stays in storage area for more than
30 days after complete discharge, additional charge is |
40.- / RT |
| |
In addition, fuel surcharge 5.00 Baht / RT. will be charged on item 2.1 and 2.2 |
| |
|
| |
2.3 |
Cargo Storage Charge |
| |
|
2.3.1 |
Import Cargo.
For storage of general cargo at storage area, exemption
period is 3 days after completed discharge from vessel |
|
| |
|
|
|
Amount(Bath/RT)
Storage Period (Day) |
| |
|
2.3.1.1 |
General Cargo |
| |
|
|
- 1 - 7 Days |
5 |
| |
|
|
- 8 - 14 Days |
10 |
| |
|
|
- 15 Days Over |
15 |
| |
|
2.3.1.2 |
Vehicle |
| |
|
|
- 1 - 7 Days |
10 |
| |
|
|
- 8 - 14 Days |
20 |
| |
|
|
- 15 Days Over |
30 |
| |
|
2.3.1.3 |
In-transit Cargo |
| |
|
|
- 1 - 60 Days |
10 |
| |
|
|
- 61 - 90 Days |
20 |
| |
|
|
- 91 Days Over |
30 |
| |
|
2.3.2 |
Export Cargo |
5.- Bath / RT
/ Day |
| |
|
|
For storage of general cargo which has not been loaded
to vessel or stuffed into storage, exemption period is
3 days after the day of passing through customs area by
land or water |
| |
|
| |
2.4 |
Valuable Cargo |
|
| |
|
Charge for storage of valuable cargo per day from the day after the complete
discharge from vessel at the rate of 1% of the cost of valuable cargo. |
| |
|
| |
2.5 |
Auction Cargo |
|
| |
|
Exemption for 3 days after the day of auction by customs clearance.After the
exemption period, charges that should be applied to pay are at the same
rate specified in item no.2.3.1 |
|
| 3. |
Admission Fee for Vehicles and Equipments into |
| |
Kerry Siam Seaport Customs Area |
| |
3.1 |
Gate entry Admission Fee |
Amount (Bath/Unit/Trip) |
| |
|
Truck less than 6 wheels |
60.- |
| |
|
Tractor Head |
60.- |
| |
|
Trailer less than 6 wheels |
80.- |
| |
|
Trailer 8 wheels or 10 wheels |
120.- |
| |
|
Trailer more than 10 wheels |
200.- |
| |
|
Forklift Truck |
200.- |
| |
|
Top-loader reach stracker |
400.- |
| |
|
Mobile crane capacity less than 100 tonnes |
600.- |
| |
|
Mobile crane capacity 100-200 tonnes |
800.- |
| |
|
Mobile crane capacity 200-300 tonnes |
1,000.- |
| |
|
Mobile crane capacity over 300 tonnes |
1,200.- |
| |
|
| |
3.2 |
Vehicles and Equipment in Customs Area |
|
| |
|
Charges for vehicles and equipments are kept in the Custom Area
more than 24 hours since the time of its entry. |
| |
|
|
|
Amount (Bath/Unit/Day) |
| |
|
Tractor Head |
200.- |
| |
|
Trailer less than 6 wheels |
300.- |
| |
|
Trailer 8 wheels or 10 wheels |
400.- |
| |
|
Forklift Truck |
400.- |
| |
|
Trailer |
500.- |
| |
|
Top-loader reach stracker |
600.- |
| |
|
Mobile crane capacity less than 100 tonnes |
1,000.- |
| |
|
Mobile crane capacity 100-200 tonnes |
1,200.- |
| |
|
Mobile crane capacity 200-300 tonnes |
1,400.- |
| |
|
Mobile crane capacity over 300 tonnes |
1,600.- |
| |
|
| |
3.3 |
Truck Weighing Service Charges |
|
| |
|
Charges for the use of truck weighing machine shall be at the following rate. |
| |
|
|
|
Amount (Bath/Unit/Service) |
| |
|
4-6 Wheels truck |
|
50.- |
| |
|
8-10 Wheels truck |
|
60.- |
| |
|
Truck exceeding 10 wheels or trailer |
|
70.- |
| |
|
| |
3.4 |
Floating Crane Fee |
|
(By Quotation) |
| |
|
(For loading or unloading cargo using private floating crane
within the Kerry Siam Seaport Limited Area Fee for operation) |
|
|
| 4. ICD Tariff |
|
20 |
40 |
45 |
| 4.1 |
Import Lift On charge - collect from Consignee |
| |
|
- FCL |
|
670 |
1000 |
1070 |
| |
|
- Empty Container |
|
240 |
360 |
380 |
| |
|
| 4.2 |
Export Lift Off charge - collect from Shipper |
| |
|
- FCL |
|
500 |
750 |
800 |
| |
|
- Empty Container |
|
240 |
360 |
380 |
| |
|
| 4.3 |
Container status -CFS/LCL Term |
| |
4.3.1 |
Wharf Handling Charge |
|
|
|
|
| |
|
- Import Cargo |
45.-/RT |
| |
|
- Export Cargo |
40.-/RT |
| |
4.3.2 |
Additional wharf handling
charge(Import cargo) which stays
in storage area more than 30 days
after complete discharge |
40.-/RT |
| |
4.3.3 |
Cargo Storage Charge ** free time
3 days after complete discharge from vessel |
|
|
|
| |
|
- Storage period 1-7 days |
5.-/RT |
| |
|
- Storage period 8-14 days |
10.-/RT |
| |
|
- Storage period 15 days Over |
15.-/RT |
| |
4.3.4 |
Change of Container Status
from LCL to FCL or FCL to LCL
(Collect From Applicant) |
|
300 |
450 |
500 |
| |
4.3.5 |
Stuffing/Unstuffing Charge/Rework |
|
|
|
| |
|
- General Cargo |
|
1,500 |
2,500 |
2,500 |
| |
(This charge excludes container movement from CY to stuffing/unstuffing area) |
|
|
|
|
| |
4.3.6 |
Extra Container Movement - per movement |
|
300 |
510 |
600 |
| |
4.3.7 |
Lift on/Lift off per status (activity in CY or CFS) |
|
|
|
| |
|
- Empty container |
|
300 |
600 |
600 |
| |
|
- Laden container |
|
400 |
800 |
800 |
| |
4.3.8 |
Special equipment rental - Forklift 15 tons |
|
|
|
| |
|
- Half day (4 hours) |
8,000.-/unit |
| |
|
- Full day (8 hours) |
15,000.-/unit |
| |
4.3.9 |
Re-Location Charge |
|
300 |
510 |
600 |
| |
|
(For arranging inward FCL which stays more than 7 days) |
|
|
|
| |
4.3.10 |
Container Storage Charge(per day) - Free time 3 days |
|
|
|
| |
|
- Empty Container storage period |
|
|
|
| |
|
1-7 days |
|
25 |
50 |
60 |
| |
|
8-14 days |
|
50 |
100 |
120 |
| |
|
15 days over |
|
100 |
200 |
240 |
| |
|
- Laden Container storage period |
|
|
|
| |
|
1-7 days |
|
125 |
250 |
310 |
| |
|
8-14 days |
|
250 |
500 |
620 |
| |
|
15 days over |
|
400 |
800 |
990 |
| |
4.3.11 |
Chassis Storage Charge/Day |
|
200 |
200 |
200 |
| |
4.3.12 |
Reefer Electricity Charge including monitoring - per Day |
|
430 |
700 |
810 |
| |
4.3.13 |
Electricity Supply Charge for Pre-Trip Inspection(PTI) or Pre-cool |
| |
|
- Less than 3 hours |
|
215 |
350 |
405 |
| |
|
- More than 3 hours |
|
430 |
700 |
810 |
| |
4.3.14 |
Container Cleaning Charge |
|
|
|
| |
|
- Sweeping |
|
0 |
0 |
0 |
| |
|
- Washing with detergent or without detergent |
120 |
240 |
240 |
| |
|
- Chemical Wash |
|
300 |
600 |
600 |
| |
4.3.15 |
Container Weighing Service(Include VAT) |
|
30 |
30 |
30 |
| |
|
| 4.4 |
Counter Service Tariff |
|
Export |
|
Import |
| |
4.4.1 |
รายการที่ 1-3 เหมาจ่าย |
|
120 |
|
140 |
| |
4.4.2 |
รายการที่ 4-20 คิดรายการละ |
|
25 |
|
30 |
| |
4.4.3 |
รายการที่ 21 เป็นต้นไป คิดรายการละ |
12 |
|
16 |
| |
4.4.4 |
ยกเลิกใบขนสินค้า |
|
25 |
|
25 |
| |
4.4.5 |
ใบกำกับการขนย้าย FCL/LCL |
|
25 |
|
- |
| |
4.4.6 |
แบบแสดงรายการที่ส่งออกไปครบ(SHORT) |
25 |
|
- |
| |
4.4.7 |
ส่งใบขนขาออก 04 กลับทาง email |
10 |
|
- |
| |
4.4.8 |
ส่งแล้ว Error คิดค่าใช้จ่าย 50% ของราคาปกติของแต่ละเอกสาร |